January 15, 2018

[January/2018 Cisco Updated] Discount Cisco 200-125 Dumps CCNA (v3.0) Exam Study Guide Are Based On The Real Exam Video Training 755Q&As Share[6-18]

By admin

Are you still upset about how to pass Cisco certification 200-125 dumps actual test? The CCNA Cisco Certified Network Associate CCNA (v3.0) (200-125 CCNA) exam is a 90 Minutes (60 – 70 questions) assessment in pass4itsure that is associated with the CCNA Routing and Switching certification. Discount Cisco 200-125 dumps CCNA (v3.0) exam study guide are based on the real exam video training. “CCNA Cisco Certified Network Associate CCNA (v3.0)” is the exam name of Pass4itsure Cisco 200-125 dumps test which designed to help candidates prepare for and pass the Cisco 200-125 exam. Pass4itsure’s exercises are very similar with the real https://www.pass4itsure.com/200-125.html dumps exam, which can ensure you a successful passing the Cisco certification 200-125 dumps questions.

[January/2018 Cisco 200-125 Dumps Updated From Google Drive]: https://drive.google.com/open?id=0BwxjZr-ZDwwWT2VSaUVoODRKR1k

[January/2018 Cisco 300-075 Dumps Updated From Google Drive]: https://drive.google.com/open?id=0BwxjZr-ZDwwWTk00ekx3V0xfX3c

200-125 dumps

Pass4itsure Cisco 200-125 Dumps Exam Questions – 100% Success Guaranteed

Question No : 6 – (Topic 1)  Refer to exhibit:
200-125 dumps

Which two destination addresses will be used by Host A to send data to Host C? (Choose  two.)
A. the IP address of Switch 1
B. the MAC address of Switch 1
C. the IP address of Host C
D. the MAC address of Host C
E. the IP address of the router’s E0 interface
F. the MAC address of the router’s E0 interface
200-125 exam 
Answer: C,F
Explanation:
While transferring data through many different networks, the source and destination IP addresses are not changed. Only the source and destination MAC addresses are changed. So in this case Host A will use the IP address of Host C and the MAC address of E0 interface to send data. When the router receives this data, it replaces the source MAC address with its own E1 interface’s MAC address and replaces the destination MAC address with Host C’s MAC address before sending to Host C.
Question No : 7 – (Topic 1) A network interface port has collision detection and carrier sensing enabled on a shared twisted pair network. From this statement, what is known about the network interface port?
A. This is a 10 Mb/s switch port.
B. This is a 100 Mb/s switch port.
C. This is an Ethernet port operating at half duplex.
D. This is an Ethernet port operating at full duplex.
E. This is a port on a network interface card in a PC.
Answer: C
Explanation:
Modern Ethernet networks built with switches and full-duplex connections no longer utilize CSMA/CD. CSMA/CD is only used in obsolete shared media Ethernet (which uses repeater or hub).
Question No : 8 – (Topic 1)
In an Ethernet network, under what two scenarios can devices transmit? (Choose two.)
A. when they receive a special token
B. when there is a carrier
C. when they detect no other devices are sending
D. when the medium is idle
E. when the server grants access
200-125 dumps 
Answer: C,D
Explanation:
Ethernet network is a shared environment so all devices have the right to access to the medium. If more than one device transmits simultaneously, the signals collide and cannot reach the destination. If a device detects another device is sending, it will wait for a specified amount of time before attempting to transmit. When there is no traffic detected, a device will transmit its message. While this transmission is occurring, the device continues to listen for traffic or collisions on the LAN. After the message is sent, the device returns to its default listening mode.
Question No : 9 – (Topic 1)  Refer to the exhibit.
200-125 dumps
After HostA pings HostB, which entry will be in the ARP cache of HostA to support this transmission?

200-125 dumps

A. Exhibit A
B. Exhibit B
C. Exhibit C
D. Exhibit D
E. Exhibit E
F. Exhibit F
Answer: A
Explanation:
Host A knows host B is in another network so it will send the pings to its default gateway
192.168.6.1. Host A sends a broadcast frame asking the MAC address of 192.168.6.1. This
information (IP and MAC address of the default gateway) is saved in its ARP cache for later
use.

Question No : 10 – (Topic 1)  A network administrator is verifying the configuration of a newly installed host by establishing an FTP connection to a remote server. What is the highest layer of the protocol stack that the network administrator is using for this operation?
A. application
B. presentation
C. session
D. transport
E. internet
F. data link
200-125 pdf 
Answer: A
Explanation:
FTP belongs to Application layer and it is also the highest layer of the OSI model.
Question No : 11 – (Topic 1)
Refer to the exhibit.
200-125 dumps

Host A pings interface S0/0 on router 3. What is the TTL value for that ping?
A. 252
B. 253
C. 254
D. 255
Answer: B
Explanation:
From the CCNA ICND2 Exam book: “Routers decrement the TTL by 1 every time they forward a packet; if a router decrements the TTL to 0, it throws away the packet. This prevents packets from rotating forever.” I want to make it clear that before the router forwards a packet, the TTL is still remain the same. For example in the topology above, pings to S0/1 and S0/0 of Router 2 have the same TTL. The picture below shows TTL values for each interface of each router and for Host B. Notice that Host A initializes ICMP packet with a TTL of 255:
200-125 dumps

QUESTION 12
Once the project’s WBS has been created what process may happen next?
A. Estimate activity resources
B. Define activities
C. Estimate activity durations
D. Sequence activities
200-125 vce Correct Answer: B
Explanation
Explanation/Reference:
Explanation:
The define activities process is the process that may begin once the project’s WBS has been completed and approved. It is possible, in some projects, to complete the WBS and the activity list at the same time.
Answer option D is incorrect. Sequencing the activities cannot happen until the activity list has been created.
Answer option A is incorrect. Estimating activity resources is dependent on the activity list, so this choice is
not valid.
Answer option C is incorrect. Estimate activity durations are dependent on the activity list, so this choice is not valid.
QUESTION 13
Which of the following scheduling techniques identifies the successor activities and the predecessor
activities to assist the project manager in sequencing the project work?
A. Precedence Diagramming Method
B. Schedule network template
C. Dependency determination
D. Activity on the Node
Correct Answer: A
Explanation
Explanation/Reference:
Explanation:
The Precedence Diagramming Method uses both predecessors and successors as nodes in the project network diagram. The PDM approach is the most common network diagram approach used. Answer
option C is incorrect. Dependency determination identifies the order of the project work. Answer option B is incorrect. The schedule network template is a tool that uses a previous project network diagram as a base for the current project network diagram. Answer option D is incorrect. Activity on the node places activities
on circles within a network diagram. It is an example of the precedence diagramming method.
QUESTION 14
You are the project manager of the NHGQ project for your company. You must create and distribute performance reports every week to your key project stakeholders. What communication technique do you normally use to distribute reports?
A. Push technique
B. Many-to-many
C. One-to-one
D. Pull technique
200-125 exam Correct Answer: A
Explanation
Explanation/Reference:
Explanation:
Performance reports are distributed through the push technique. This means that the project manager
distributes the reports regularly through a mechanism, such as email. Answer option C is incorrect. One
to-one technique describes a conversation between two people. Answer option B is incorrect. Many-to
many technique describes a conversation between many people. Answer option D is incorrect. A pull
technique describes the recipients of the report “pulling” the information, such as from a Website.
QUESTION 15
Your project team is executing the project plan and things are going well. Your team has reached its first
milestone and is now in the second phase of the project. The project stakeholders have requested that you find a method to reduce the duration of the project. They will reward you and your project team with a 25
percent bonus of the project costs if you can finish the project thirty days earlier than what was already planned. The stakeholders, however, will not approve any additional labor costs as part of the agreement.
Which approach could you use to shorten the duration of the project?
A. Perform resource leveling for the project.
B. Crash the project schedule.
C. Fast track the project.
D. Remove things from the project scope.
Correct Answer: C
Explanation
Explanation/Reference:
Explanation:
Fast tracking is a technique for compressing project schedule. In fast tracking, phases are overlapped that would normally be done in sequence. It is shortening the project schedule without reducing the project scope. It does not add any additional labor but it can introduce project risks. Answer option D is incorrect.
Removing things from the project scope can reduce the project duration, but it will not satisfy the requirements the stakeholders have identified. Answer option A is incorrect. Resource leveling can actually
increase the project duration. Answer option B is incorrect. Crashing can reduce the project duration but it increases the labor expense, something the stakeholders won’t approve.
QUESTION 16
The Define Activities process is the first process in the project time management knowledge are a. The Define Activities process creates just three outputs as a result of decomposition, rolling wave planning,
templates, and expert judgment. Which one of the following is not an output of the Define Activities process?
A. Activity list
B. Milestone list
C. Activity attributes
D. Project document updates
200-125 dumps Correct Answer: D
Explanation
Explanation/Reference:
Explanation:
Project document updates are not an output of the Define Activities process. Project document updates
are the outputs for estimate activity resources. Project document updates include the following:
Activity list
Activity attributes
Resource calendars
Answer option A is incorrect. The activity list is an output of the define activities process. Answer option C
is incorrect. The activity attributes is an output of the define activities process. Answer option B is incorrect. The milestone list is an output of the define activities process.

QUESTION 17
Examine the figure given below:
If Activity B takes eight days to complete instead of five days as schedule, how long can you now delay
Activity H?
A. Three days
B. One day
C. Four days
D. Zero days
Correct Answer: B
Explanation
Explanation/Reference:
Explanation:
Activity B is not on the critical path and it has a total of four days of float. If Activity B takes a total of eight
days, it will consume three days of float. However, the total duration of the path ABEHJ may not exceed 26 days, as this is the total duration for the project. Although Activity H has a total of four days of float available, the consumption of three days of float on this path will reduce the total float for Activity H to just
one day. If Activity H is delayed by more than one day, then the project will be late. Answer option D is
incorrect. There is one day of float still available for Activity H. Answer options A and C are incorrect.
These are not the valid answers, as there is just one day of float available for Activity H.
QUESTION 18
You are the project manager of the GHT Project. Ben, one of your project team members, does not
understand the idea of a milestone. Which of the following best describes what a milestone is?
A. A significant point in the project
B. A goal of reaching a significant delivery of project benefits by an identified date
C. An imposed date for the project to reach a given point
D. The completion of a project activity that is crucial to project completion
200-125 pdf Correct Answer: A
Explanation
Explanation/Reference:
Explanation:
A milestone is simply a significant point or event in the project. It does not have to be assigned to a specific date, but is usually assigned to the completion of project phases. A milestone is the end of a stage that
  marks the completion of a work package or phase, typically marked by a high level event such as completion, endorsement or signing of a deliverable, document or a high level review meeting. In addition to signaling the completion of a key deliverable, a milestone may also signify an important decision or the derivation of a critical piece of information, which outlines or affects the future of a project. In this sense, a milestone not only signifies distance traveled (key stages in a project) but also indicates direction of travel since key decisions made at milestones may alter the route through the project plan. To create a milestone, enter 0 (zero) in the Duration field. The task will automatically be classified as a milestone. Answer option C is incorrect. This is a project constraint. Answer option B is incorrect. A project goal is an objective for time, cost, scope, and other metrics. Answer option D is incorrect. All activities must be completed in order to complete the project work. Activities that are not completed are quality issues that prevent the project from completing the project scope.

 

 

200-125 dumps

Pass4itsure can provide you a pertinence training and high quality exercises, which is your best 200-125 dumps preparation for your first time to attend Cisco certification 200-125 dumps test questions. “CCNA Cisco Certified Network Associate CCNA (v3.0)”, also known as 200-125 exam, is a Cisco certification which covers all the knowledge points of the real Cisco exam. Pass4itsure Cisco 200-125 dumps exam questions answers are updated (755 Q&As) are verified by experts. The associated certifications of 200-125 dumps is CCNA Routing and Switching.  If you fail the https://www.pass4itsure.com/200-125.html dumps exam, we will give you a full refund.

Read More Youtube: https://youtu.be/z3PN5P0gTDk